D6.18 is including:
• An analysis of the integration of the different i4Q Solutions that are part of the pipeline of each one of the i4Q Pilots.
• A list of the problems that appeared during the integration and the corrective measures applied

/ Resources / Reports
D6.18 is including:
• An analysis of the integration of the different i4Q Solutions that are part of the pipeline of each one of the i4Q Pilots.
• A list of the problems that appeared during the integration and the corrective measures applied
27.06.2025 / #Expert activities
EACTDA Licensing Scheme Review & Update – Workshops with Stakeholders and LIF